91°µÍø

91°µÍø | Infrastructure that Delivers Leading specialty contractor engineers, designs and constructs infrastructures for electric power generation and transmission, oil and natural gas pipelines, renewable energy facilities and wireless networks.
Oil & Gas icon

Kearl Oil Sands - Heavy Civil Construction

Pilings & Foundations | Kearl Lake, AB

Scope of Work

Installation of pilings and foundations for Imperial Oil’s Kearl Lake Oil Sands project. Approximately 11,000 cubic meters of concrete; 1,300,000 kg of steel reinforcing bars; 237 30” diameter driven pipe piles up to 110 ft depth; 2,02024” diameter driven steel pipe piles up to 110 ft depth; 1000m of HDPE pipe installed.

Services Employed

  • Pilings
  • Foundations

Services Provided by:

Related Projects

Natural Gas Pipeline Projects
Oil & Gas icon

Natural Gas Pipeline Projects

Pipeline Construction

New York and Pennsylvania
Nacogdoches, Texas Natural Gas Pipeline
Oil & Gas icon

Nacogdoches, Texas Natural Gas Pipeline

Pipeline Construction in Texas

Nacogdoches, Texas
Natural Gas Pipeline
Oil & Gas icon

Natural Gas Pipeline

Pipeline Construction

Owatonna, MN
305.599.1800 services@mastec.com